top block The Armor Grouptop block

The Armor Group - Lebanon Ohio Facility

Armor’s Lebanon Facility Expands on the Manufacturing Capabilities of the Mason Plant

Located only minutes from Armor's Mason location, the Lebanon facility brings powder coating capabilities and additional manufacturing and warehousing space. Lebanon’s powder coat facility is equipped to handle large or small runs. Armor's automated powder coat line can handle long assemblies and large squared pieces up to 2.5 ft. x 5 ft. x 20 ft. long. For larger items in smaller runs the batch powder coat ovens can handle parts 7 ft. x 7 ft. x 7 ft.

  • 40,000 s.f. of Production and Warehousing space
  • 30 Employees
  • Powder Coat Facility
    • Conveyorized line for Production Runs
    • Batch ovens for large or single run item

 

Armor Mason Facility

 


Armor Markets